Description of works: construction of a drill pad
W1 and the supply and installation of approximately 1.3 km of 300 mm diameter PVC C900 pipe buried in a trench for the supply of water from the Rabacca river to the drill pad site W1. Road Construction and Paving services such as retaining walls and associated utilities.
Employed by:
The St. Vincent Geothermal Company
Project period: May-18 to Dec-18